Ready for Commissioning

In this article


Enabling "Ready for Commissioning"

  • From the Account Settings page, switch to the Features tab and "Ready for Commissioning" can be found under the "Access and Permission Overrides" section

top


Ready Status and Ready Date

Equipment Detail

Once the "Ready for Commissioning" feature is enabled, equipment can have a Ready Status and Ready Date. These values are displayed on the equipment list, in equipment PDFs, and on an equipment's detail page. The equipment detail page will also have a new Ready Date button that can be used to set or edit these values.

top


Ready Digest

Ready for Commissioning activity is only shown in a dedicated daily digest email. Fields for who receives the digest and when the digest is sent can be found at the bottom of the project's General Settings page.

top

Still need help? Contact Us Contact Us